Barco DP2K Series Uživatelský manuál Strana 13

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 19
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 12
3. Installation procedures (for DPxK-xxB)
3. INSTALLATION PROC EDUR ES (FOR DPXK-XXB)
3.1 Installing the Touch Panel interface
Necessary tools
17mm open end wrench.
10mm open end wrench.
How to install the Touc h P anel interface upon the projector?
1. Assemble the mounting p late and the swivel arm together as illustrated. First the nut (N) upon the rod of the mounting plate, then
the lock washer (L), and then fasten mounting plate and swivel arm together. When arm is mounted, turn nut (N) against the arm
to secure the position. ( image 3-1)
2. Slide the 10mm spac er (reference 1 ) over the bas e of the s wivel arm and insert he base of the swivel ar m into one of the mounting
holes at the rear top side of the pr ojector. (image 3-2)
3. Place the Touch Panel interface upon the mounting plate of the swivel arm a nd fasten the two w ing n u
ts ( W ) as illustrated.
(image 3-3)
4. Connect the DC plug, the RJ45 Ethernet plug and the D-SUB plug into their respective s ockets on the Touc h Panel interface.
(image 3-4)
5. Connect the circular plug of the multi cable with the circular socket at the right side (reference 2) of the projector. (image 3-5)
6. Attach the multi cable to the swivel arm using the two Velcro strips.
N
L
Image 3-1
1
Image 3-2
R59770149 COMMUNICATOR TOUCH PANEL 25/04/2012 9
Zobrazit stránku 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 19

Komentáře k této Příručce

Žádné komentáře